Skip to Main Content

Concrete Leveling and Slab Lifting in West Texas

Commercial Concrete Services

A warehouse aisle that has dropped three quarters of an inch at a joint will chip forklift wheels, jar loads and eventually crack the slab edge, and the sunken panel is usually still in good shape. Raising a settled slab back to grade with grout or foam costs a fraction of tearing it out, provided whatever caused the drop has been found and stopped.

We level and lift sunken slabs, sidewalks, driveways, dock aprons, equipment pads and parking areas for facility managers, general contractors, schools and municipal crews. Specialty lifting is performed by trade partners we coordinate, using cementitious grout or polyurethane foam injected through small holes. The concrete partners we coordinate take care of preparation, survey, new panels where a slab cannot be saved and finishing afterward.

The process works best when someone asks why the slab moved. Poor compaction, leaking pipes, drainage that sends water under the edge, soils that swell and shrink with moisture and voids from eroded fill are common causes in this region. We look for the cause first and offer lifting only when it will hold.

Lifting, replacing and the work around it

Lifting often pairs with other work. If a panel has broken beyond saving, we turn to concrete demolition and removal and pour fresh flatwork in its place. When a settled slab is mixed with failed joints, concrete repair and restoration covers the joint rebuild, edge repair and sealing.

Drainage matters as much as the lift. A downspout that dumps beside a foundation or a grade that slopes into a slab will undo any correction in a few seasons. For that reason we often include trench drains and concrete drainage or small regrading in the proposal.

What moves the price of a lift

Lifting is usually priced by the area or by the number of injection points, with a minimum charge that reflects mobilization. Travel in this region often exceeds the cost of the material on a small job, so grouping several slabs on the same trip lowers the unit cost. The depth of void, the weight of the slab and the type of fill decide how much material goes in.

Access also matters. A slab inside an operating building with limited headroom costs more to lift than one in an open lot. If the work requires saw-cutting to relieve stress, traffic control or night work, those items appear on separate lines so owners can see what is behind each dollar.

Steps from survey to final check

A typical job starts with an elevation survey of the settled area and a probe for voids. We mark injection points, drill small holes, inject grout or foam in stages while watching a laser level and then check the slab against the target grade. Holes are patched and the surface is cleaned. Joints and cracks are sealed afterward so water does not return.

We also handle leveling of slabs that tilt toward a building, where the goal is to restore drainage away from the wall. On interior floors, the target may be a flatness tolerance for racking or machinery, and the survey tells us whether lifting can reach it. Some floors cannot be lifted to tight tolerances and need grinding or a topping slab.

Buildings that see settlement

Warehouses and distribution buildings develop settlement at dock aprons, truck courts and slab edges. Retail centers see sunken sidewalks and sloped entries. Schools and clinics need level walks and ramps for accessibility. Residential-style slabs in multifamily projects can shift near downspouts and landscaping.

In Midland, a draw crosses the northern edge of town on ground near 2,800 feet, so a site there may have drainage paths that cross parking and paving. Flat ground can still hold water, and a slab that looks level on a plan often drains slowly in practice.

Owners who ask us to lift

Facility managers at industrial and manufacturing owners call us when a forklift aisle or machine area has settled. Municipal public works departments ask for sidewalk and curb lifting to remove trip hazards. Agricultural operations, including those around Pecos where irrigation from underground aquifers supports cotton, onions and cantaloupes, deal with wet ground near wash areas and processing slabs.

Along the Rio Grande near Presidio, where the Rio Conchos meets the river and creates a flood plain suited to farming, shifting alluvial soils and high water tables affect slabs of every kind. Each owner has a different tolerance for downtime and a different budget, and we plan accordingly.

Finding the cause before we lift

We look at surface drainage, downspouts, leaking lines, pavement edges and the soil itself. If there is a plumbing leak, we recommend fixing it first. If water collects at an edge, we recommend regrading. If the subgrade was poorly compacted, we discuss whether lifting will stabilize the area or whether full replacement is the more durable option.

During injection, we watch the slab with a level and stop at the target. Overlifting is a real risk, and so is moving a slab that is connected to another structure. We lift gradually and in a pattern that avoids cracking, and we document the final elevations.

Specifications and approvals

Many lifting jobs need no permit, but the owner or the engineer may specify the material, the allowable lift and the final tolerance. Public projects often call for material data sheets and installer qualifications. Shallowater occupies the flat high plains of the Llano Estacado, a little over 3,200 feet up, and sites like it with little natural relief give the engineer less room for error on drainage slopes.

For accessible routes, the final cross slope and running slope have to meet the accessibility standard adopted locally. We measure and report them, and if lifting cannot reach the required slopes, we say so and propose replacement.

Drilling, injection and equipment

Drilling through a slab creates silica dust, so we use dust control and the right protective equipment. Injection equipment runs under pressure, and hoses and fittings are checked daily. Foam materials give off fumes during mixing, and crews handle them under the manufacturer's safety guidance with ventilation in enclosed areas.

We also locate utilities before drilling and keep equipment away from foot traffic. In occupied buildings, we protect floors, set up dust barriers and coordinate with the facility manager so aisles and doors can reopen quickly.

Send photos of the sunken slab

Photos, a rough sketch of the area and the town are enough to get started. We combine small jobs into one trip where we can, check drainage and the likely cause, and give you a written plan with lift targets and traffic-return times.

Common Questions

Is lifting a slab better than replacing it?

Lifting is faster and less disruptive when the slab is sound and the cause of settlement is corrected. Replacement is better when the slab is badly cracked, deteriorated or sitting on soil that will keep moving. We tell you which one fits.

How soon can traffic use a lifted slab?

With foam, light traffic can often return within hours, while cementitious grout needs more cure time. The product data sheet governs, and we post the return-to-service time on site.

Will the slab settle again?

It can if the cause remains. Leaks, poor drainage or unstable fill will keep acting on the slab. That is why we investigate first and recommend drainage work along with the lift.

What does a minimum charge mean on a remote job?

It covers crew travel, equipment setup and the cost of bringing materials to the site. Grouping several small slabs on one trip spreads that cost, so we ask for a complete list before we schedule.

Can you level a floor inside an operating plant?

Yes. We drill, inject and clean with dust control, and we work in sections so aisles remain open. The plant's safety rules govern, and we provide a daily summary of areas lifted and areas still to finish.

Ready to talk about your project?

ServicesBuilding TypesIndustriesService AreasAboutContactRequest a Project Review432-223-9736
Call432-223-9736